Dome Technology was contracted to rehabilitate the 475-foot (145m) Hebgen Lake outlet pipe for another century of function by installing a concrete liner inside the existing pipe.
100-year-old pine staves removed from pipe
One-foot-thick layer of steel-reinforced concrete lining added to existing tunnel
Related Videos
Here are some videos related to Outlet-Pipe Rehabilitation – Montana, USA.